Technical Japanese #20 — Common Japanese Factory Abbreviations: QC, QA, WIP, Takt and Lot
In a Japanese production meeting people speak in abbreviations: 「QCで弾かれた」, 「WIPが溜まってる」, 「段取り替え中」. Without them, every sentence arrives half-heard. This post collects the shop-floor abbreviations — the Latin ones and the clipped Japanese ones — so that hearing them is enough.
Core abbreviations and shortened terms
| Japanese / abbreviation | Reading | Meaning | On the floor | Note |
|---|
| QC | kyū shī | quality control | QCで弾かれた | Quality Control |
| QA | kyū ē | quality assurance | QAの承認 | Quality Assurance |
| WIP / 仕掛品 | しかかりひん shikakarihin | work in process | WIPが溜まる | Work In Process |
| PT | pī tī | pilot run | PTを流す | Pilot, or 試作 depending on the plant |
| 段取り | だんどり dandori | set-up, changeover | 段取り替え | Between lots |
| タクト | takuto | takt | タクトを守る | Takt time |
| ライン | rain | line | ライン停止 | The production line |
| ロット | rotto | lot | ロット不良 | A batch |
| 不良 | ふりょう furyō | defect | 不良を出す | See #10 on quality |
| 不良率 | ふりょうりつ furyōritsu | defect rate | 不良率が高い | Defect rate |
| 数 | かず kazu | count, number | 数が合わない | The count does not match |
| 計画 | けいかく keikaku | plan | 生産計画 | Plan |
| 実績 | じっせき jisseki | actual result | 実績を入力 | Actual, against 計画 |
| 稼働率 | かどうりつ kadōritsu | operating rate | 稼働率を上げる | Utilisation |
| 指示 | しじ shiji | instruction | 指示書通り | As per the instruction sheet |
| 改善 | かいぜん kaizen | improvement | 改善提案 | See #39 |
| QCD | — | quality, cost, delivery | QCDのバランス | The three that get traded off |
| PM / 予防保全 | よぼうほぜん yobō hozen | preventive maintenance | PMの計画 | Preventive Maintenance |
| ダウンタイム | daun taimu | downtime | ダウンタイム削減 | Downtime |
The Japanese-style clippings to watch for
Japanese shortens by sound, and the result can be unrecognisable until someone tells you.
- 段替え (dan-gae), from 段取り替え — the changeover.
- ライン止め (rain-dome), from ライン停止 — stopping the line.
- 手直し (te-naoshi) — rework on defective pieces.
- バラす (barasu) — to take apart, the spoken form of 分解.
- チョコ停 (choko-tei) — the short, repeated micro-stoppage.
- ポカミス and ポカヨケ — a careless mistake, and the device that makes the mistake impossible.
Phrases by situation
In the production meeting
- QCで不良が見つかりました。 — QC found a defect.
- 段取り替えに時間がかかっています。 — The changeover is taking too long.
- WIPが溜まっているのでラインを止めます。 — Work in process is piling up, so we are stopping the line.
Asking again when you are not sure
- QCDのどれを優先しますか。 — Which of quality, cost and delivery takes priority?
- チョコ停の原因は何ですか。 — What is causing the micro-stoppages?
Mistakes to avoid
| Mistake | Why it hurts |
|---|
| Hearing PT and assuming "part" | In many plants PT is the pilot or 試作 run. If you are not sure, ask |
| Confusing 計画 (plan) with 実績 (actual) on a report | Enter the figure in the wrong column and the data is simply wrong |
| Dismissing チョコ停 | Each stop is short, but together they are what pulls 稼働率 down |
Hear it, then act — quick self-check
In the meeting: 「今日は不良率が高い。QCと一緒に原因を調べて、手直しを進めて。」
<details><summary>Answer</summary>The defect rate (不良率) is high today. Investigate the cause (原因) together with QC, and get the rework (手直し) moving.</details>
And: 「段替えが終わったら、実績を入力しておいて。」
<details><summary>Answer</summary>Once the changeover (段替え) is finished, enter the actual figures (実績) into the system.</details>
How MINATA helps
Do you need meeting terminology and forms — plan against actual, QC, WIP — standardised between a Vietnamese team and Japanese management? MINATA acts as the technical and operational bridge, aligning the vocabulary and the reporting flow. See our Japan–Vietnam projects or engineering and production services.